Projects

Old Tolbooth Wynd, Edinburgh


  • : Robb Reinstatement
  • : Edinburgh
  • : Residential
  • : 17 Apr 2018

Project Description

Keystone Preservation were contacted by our clients Robb Reinstatement to clean this fire damage from an underground car park and front elevation. We used TORC Controlled Air Abrasion to tackle the smoke damage to the front sandstone and harled elevation. Internally was bulk of the work with the entire underground car park requiring a thorough high temperature steam clean, to remove oily diesel and rubber smoke damage caused by a vehicle fire.


contact

For more information, please get in touch with our team:

hello@keystonepreservation.co.uk